Resort Painting Project Underway

Resort Painting Project UnderwayOne of the major reserve projects for 2011 is underway. Painting of the buildings began in mid-January. The color scheme can be viewed on the Resort Check-in/Administration Building. Windows in the residential buildings are also being replaced as part of the project. Exterior painting is performed every 10 years as part of resort maintenance. As of the current time, Westgate has declined to participate in the building painting project.

Tags: , , , ,


Fatal error: Uncaught Error: Call to undefined function wp_related_posts() in /home/bluetre5/public_html/wp-content/themes/blue-tree-2/single.php:22 Stack trace: #0 /home/bluetre5/public_html/wp-includes/template-loader.php(106): include() #1 /home/bluetre5/public_html/wp-blog-header.php(19): require_once('/home/bluetre5/...') #2 /home/bluetre5/public_html/index.php(17): require('/home/bluetre5/...') #3 {main} thrown in /home/bluetre5/public_html/wp-content/themes/blue-tree-2/single.php on line 22